Comparative Study between Budget and Real Cost Obtained: Case Study at a construction company in Canaa dos Carajás-PA

( Vol-5,Issue-11,November 2018 ) OPEN ACCESS
Author(s):

Antônio Miranda Coelho Neto, José Djair Casado de Assis Junior, Angelo Ricardo Balduino

Keywords:

Analytical Budget, Real cost, Reliability.

Abstract:

The budget is a tool of extreme importance in construction. It is from this that a cost forecast is obtained. In this way, this work had as objective to compare analytical budget with real cost obtained in the construction of a public nursery school held Construtora Monteiro & Pereira Ltda. For its development, it was used as methodology the analysis of budgetary worksheets and descriptive memorials that referred to the budgeting of the construction of a public nursery school. The results showed that the budget developed by the developer clearly showed the services and their respective costs, where they were detailed in a clear and precise way. At the end it was concluded that although the result was satisfactory, it was verified that there was an increase in the real cost of the work because the fixed costs incur changes in values, as the employees were admitted and / or fired.

ijaers doi crossref DOI:

10.22161/ijaers.5.11.17

Paper Statistics:
  • Total View : 234
  • Downloads : 34
  • Page No: 125-131
Cite this Article:
Click here to get all Styles of Citation using DOI of the article.