Risk Assessment Process for Construction Projects in Afghanistan
( Vol-5,Issue-8,August 2018 )
Author(s):

Mohammad Numan Aloko

Keywords:

Risk Management, Qualitative Risk Assessment, Risk Analysis, Probability matrix

Abstract:

The construction industry in Afghanistan faces challenges such as cost overruns and delays. To overcome these problems, nowadays, implementing risk management in construction field has shown improvements in the mitigation of risks which have adverse impacts on project objects such as time, cost and quality. Risk assessment process is executed as part of risk management for uncertainties that construction sector confronts in Afghanistan.21 most significant risks were identified, analyzed and evaluated using 5x5 probability matrix method. It was found that 20 out of 21 risks fell into the unacceptable and unwanted category. These risks require mitigation measures by executing risk treatment policy and need be to registered, monitored and reviewed before and during the construction phase. The findings call for necessary awareness in developing the Afghanistan construction industry’s capability and performance to execute risk management for mitigating against further project failure.

ijaers doi crossref DOI:

10.22161/ijaers.5.8.26

Paper Statistics:
  • Total View : 100
  • Downloads : 16
  • Page No: 211-217
Cite this Article:
MLA
Mohammad Numan Aloko et al ."Risk Assessment Process for Construction Projects in Afghanistan". International Journal of Advanced Engineering Research and Science(ISSN : 2349-6495(P) | 2456-1908(O)),vol 5, no. 8, 2018, pp.211-217 AI Publications, doi:10.22161/ijaers.5.8.26
APA
Mohammad Numan Aloko(2018).Risk Assessment Process for Construction Projects in Afghanistan. International Journal of Advanced Engineering Research and Science(ISSN : 2349-6495(P) | 2456-1908(O)),5(8), 211-217. http://dx.doi.org/10.22161/ijaers.5.8.26
Chicago
Mohammad Numan Aloko. 2018,"Risk Assessment Process for Construction Projects in Afghanistan". International Journal of Advanced Engineering Research and Science(ISSN : 2349-6495(P) | 2456-1908(O)).5(8):211-217. Doi: 10.22161/ijaers.5.8.26
Harvard
Mohammad Numan Aloko. 2018,Risk Assessment Process for Construction Projects in Afghanistan, International Journal of Advanced Engineering Research and Science(ISSN : 2349-6495(P) | 2456-1908(O)).5(8), pp:211-217
IEEE
Mohammad Numan Aloko."Risk Assessment Process for Construction Projects in Afghanistan", International Journal of Advanced Engineering Research and Science(ISSN : 2349-6495(P) | 2456-1908(O)),vol.5,no. 8, pp.211-217,2018.
Bibtex
@article {mohammadnumanaloko2018risk,
title={Risk Assessment Process for Construction Projects in Afghanistan},
author={Mohammad Numan Aloko},
journal={International Journal of Advanced Engineering Research and Science},
volume={5},
year= {2018},
}
Share:
References:

[1] AISA. (n.d.). Investing in the Construction & Construction Materials Sector. Retrieved August 5, 2018, from http://investinafghanistan.af/investing-in-the-construction-construction-material-sector/
[2] UNESCAP. (2015). Doing Business with AFGHANISTAN. Retrieved October 5, 2018, from http://www.unescap.org/resources/doing-business-afghanistan
[3] Gidado, K., & Karimi, S. (2012). Factors influencing construction productivity in Afghanistan.
[4] Iqbal, S., Choudhry, R. M., Holschemacher, K., Ali, A., & Tamošaitienė, J. (2015). Risk management in construction projects. Technological and Economic Development of Economy, 21(1), 65-78.
[5] International Organization for Standardization. (2009). ISO 31000: Risk Management: Principles and Guidelines. ISO.
[6] IEC, I. (2009). ISO 31010: 2009-11. Risk management–Risk assessment techniques.
[7] Dumbravă, V., & Iacob, V. S. (2013). Using probability–impact matrix in analysis and risk assessment projects. Descrierea CIP/Description of CIP–Biblioteca Națională a României Conferința Internațională Educație și Creativitate pentru o Societate Bazată pe Cunoaștere–ŞTIINŢE ECONOMICE, 42
[8] Niazi, G. A., & Painting, N. (2017). Significant factors causing cost overruns in the construction industry in Afghanistan. Procedia Engineering, 182, 510-517.
[9] Ahady, S., Gupta, S., & Malik, R. K. (2017). A study of the causes of cost overrun in construction industry in Afghanistan. International Journal of Engineering Development and Research, 5(3), 978-985.
[10] Niazai, G. A., & Gidado, K. (2012). Causes of project delay in the construction industry in Afghanistan. In Proceedings of EPPM 2012 International Conference on Engineering, Project and Production Management.
[11] Özkılıç, Ö. (2005). Occupational health and safety, management systems and risk assessment methodologies. TİSK, Ankara.
[12] British Standard, B. S. (2004). 8800: 2004. Occupational health and safety management systems—Guide.
[13] Larson, E. W., & Gray, C. F. (2015). A Guide to the Project Management Body of Knowledge: PMBOK (®) Guide. Project Management Institute.