Setup Time Optimization in the Roll-Up Process on a Motorcycle Buffer Production Line Using Kaizen |
( Vol-6,Issue-6,June 2019 ) OPEN ACCESS |
Author(s): |
Adão dos Santos Barbosa, José Roberto Lira Pinto Júnior, Keila Dayane do EspÃrito Santo Pereira, Elen Bethleen de Souza Carvalho, David Barbosa de Alencar, Jorge de Almeida Brito Júnior |
Keywords: |
Kaizen, Device Implementation, Productivity increase. |
Abstract: |
This article presents the application of Kaizen, through the implementation of a device that reduces setup time in the routing process of a production line of shock absorbers for motorcycles in the factory Amazon Motocicle Ltda, installed in the industrial hub of Manaus. Through field research the problem was identified. Kaizen reduced process setup time and increased productivity. In this way it was possible to improve the efficiency of the process in the production line by 50%, to gain productivity and to guarantee customer satisfaction. |
![]() |
Paper Statistics: |
Cite this Article: |
Click here to get all Styles of Citation using DOI of the article. |
Advanced Engineering Research and Science