Analysis of Economic Viability of the Repowering of Hydroelectric Plant |
| ( Vol-8,Issue-1,January 2021 ) OPEN ACCESS |
| Author(s): |
Eduardo Egidio Vicensi Deliza, FabrÃcio Moraes de Almeida, Flávio de São Pedro Filho, Valéria Arenhardt |
| Keywords: |
|
Small Hydroelectric Plants. Economic viability. Repowering. |
| Abstract: |
|
The present study aimed to carry out an economic feasibility study for the repowering of Small Hydroelectric Plants - SHPs. Through the application of economic parameters, it was possible to evaluate the potential gains obtained through repowering. The case study was carried out at Martinuv SHP, located in the city of Vilhena / RO. |
| Article Info: |
|
Received: 21 Oct 2020; Received in revised form: 09 Jan 2021; Accepted: 19 Jan 2021; Available online: 31 Jan 2021 |
|
|
| Paper Statistics: |
|
| Cite this Article: |
| Click here to get all Styles of Citation using DOI of the article. |



Advanced Engineering Research and Science